Dear investors of sections 3.1–3.4!

You can schedule an inspection of the premises and obtain the Acceptance Certificate, after which you can schedule an appointment and submit documents for ownership registration and the technical passport.

Pre-registration by phone: +38 (048) 775 9 775

Please note!
Our internal exchange rate is always lower than the market rate.
1 USD = 43.9000 UAH Pay under the contract
This property is
being viewed now:
  • General Information
  • Infrastructure
  • Technical Information
  • Layouts
  • Layout options
  • Prices
  • Photo Gallery
  • Video Gallery

View gallery

PROJECT PROGRESS

Sections 1.1-1.4 - commissioned.

Sections 2.1-2.2 - commissioned.

Sections 3.1-3.4 - commissioned.

Sections 4.1-4.2

Foundation construction

100%

Building frame construction

100%

Masonry of external and internal walls

45%

Facade works

15%

Roofing installation

5%

Installation of internal utilities

0%

Interior finishing works

0%

Landscaping

0%

Sections 5.1-5.2

Foundation construction

100%

Building frame construction

2%

Masonry of external and internal walls

0%

Facade works

0%

Roofing installation

0%

Installation of internal utilities

0%

Interior finishing works

0%

Landscaping

0%
* Responsible – Yury Yamkovoy

Residential Complex "Prokhorovskyi kvartal"

  • 40 Prokhorovskaya Street
  • Sections 1.1–1.4 — commissioned.
  • Sections 2.1–2.2 — commissioned.
  • Sections 3.1–3.4 — commissioned.
  • Commissioning of Sections 4.1–4.2 — Q3 2026.
  • Commissioning of Sections 5.1–5.2 — Q3 2027.

The residential complex “Prokhorovskyi Kvartal” is being built in the historical part of the city and perfectly combines advanced construction technologies, a well-thought-out concept, and a prime location.

  • A cozy and comfortable mini-quarter in the historical part of the city
  • 10 minutes to the city center
  • A well-developed neighborhood with schools, kindergartens, clinics, shops, beauty salons, fitness clubs, and more
  • Two green parks nearby: Prokhorovskyi and Mikhailovsky
  • Recreation areas and pedestrian walkways
  • Original design of the common areas
  • Own property management company
  • Gated and secured territory.

View gallery

PROJECT PROGRESS

Sections 1.1-1.4 – commissioned.

Sections 2.1-2.2 – commissioned.

Sections 3.1-3.4 – commissioned.

Sections 4.1-4.2

Foundation construction

100%

Building frame construction

100%

Masonry of external and internal walls

45%

Facade works

15%

Roofing installation

5%

Installation of internal utilities

0%

Interior finishing works

0%

Landscaping

0%

Sections 5.1-5.2

Foundation construction

100%

Building frame construction

2%

Masonry of external and internal walls

0%

Facade works

0%

Roofing installation

0%

Installation of internal utilities

0%

Interior finishing works

0%

Landscaping

0%
* Responsible – Yury Yamkovoy
 

Residential Complex "Prokhorovskyi kvartal"

    • A multi-storey residential complex with underground parking and social and commercial facilities.

      Construction start: Sections 1.1–1.4 – Q3 2018
      Construction completion: 

      Sections 1.1–1.4 – commissioned.

      Sections 2.1–2.2 – commissioned.

      Sections 3.1–3.4 – commissioned.

      Sections 4.1–4.2 – Q3 2026.

      Sections 5.1–5.2 – Q3 2027.

      Contractor: LLC “Stikon”.
      Developer: ODO “Odesa Mechanical Plant”
      Location: 40 Prokhorovskaya Street

      ENGINEERING SYSTEMS
      Project type: monolithic-frame.
      Foundation: pile foundation. 
      Floor slabs: monolithic reinforced concrete. 
      Roof: combined roof (soft roofing with metal tiles).
      Flooring: screed, except in bathrooms.
      External facade finish: ceramic facing bricks.
      Internal wall finish: no finishing, except for common areas.
      Ceiling height (m): 2.7 m.
      Heating system: supplied from an autonomous rooftop boiler room; two-pipe dead-end system with horizontal in-apartment distribution; steel panel radiators with shut-off and control valves.
      Windows: uPVC Rehau profiles, hardware included, energy-efficient double-glazing units.

      INTERNAL ENGINEERING NETWORKS 
      Power supply: connections to apartments, with installation of meters and circuit breakers in the floor distribution panels.
      Sewerage: soundproof waste pipes. 

Master Plan

Parking Plan

Parking Plan (Phase 2)

Sections 1.1-1.4

Plan of the Basement Floor

Plan of the 1st Floor

2nd Floor Plan

Floors 3–5, 8, 9, 13, 14 Plan

Plan of Floors 6–7 and 10–12

15th Floor Plan

16th Floor Plan

Plan of the Basement Floor

Plan of the 1st Floor

Plan of the 2nd Floor

Plan of Floors 3–5, 8, 9, 13 and 14

Plan of Floors 6–7 and 10–12

15th Floor Plan

16th Floor Plan

Plan of the Basement Floor

Plan of the 1st Floor

Plan of Floors 2, 6–7 and 10–12

Plan of Floors 3–5, 8, 9, 13 and 14

15th Floor Plan

16th Floor Plan

Plan of the Basement Floor

Plan of the 1st Floor

2nd Floor Plan

Floors 3–5, 8, 9, 13, 14 Plan

Floors 6, 7, 10–12 Plan

15th Floor Plan

16th Floor Plan

Sections 2.1-2.2

Plan of the Basement Floor

Plan of the 1st Floor

План 2-14 этажей

15th Floor Plan

16th Floor Plan

Plan of the Basement Floor

Plan of the 1st Floor

Floors 2–14 Plan

15th Floor Plan

16th Floor Plan

Sections 3.1-3.2

Plan of the Basement Floor

Plan of the 1st Floor

Floors 2–4, 6–14 Plan

5th Floor Plan

15th Floor Plan

16th Floor Plan

Plan of the Basement Floor

Plan of the 1st Floor

2nd Floor Plan

Floors 3–14 Plan

15th Floor Plan

16th Floor Plan

Sections 3.3-3.4

Plan of the Basement Floor

Plan of the 1st Floor

2nd Floor Plan

Floors 3–14 Plan

15th Floor Plan

16th Floor Plan

Plan of the Basement Floor

Plan of the 1st Floor

2nd Floor Plan

Floors 3, 4, 8–10, 14 Plan

Floors 5–7, 11–13 Plan

15th Floor Plan

16th Floor Plan

Sections 4.1-4.2

Basement Floor Plan

Plan of the 1st Floor

2nd Floor Plan

3rd Floor Plan

Floors 4, 8–10, 14 Plan

Floors 5–7, 11–13 Plan

15th Floor Plan

16th Floor Plan

Plan of the 1st Floor

2nd Floor Plan

3rd Floor Plan

Floors 4, 8–10, 14 Plan

Floors 5–7, 11–13 Plan

15th Floor Plan

16th Floor Plan

Sections 5.1-5.2

Basement Floor Plan

2nd Floor Plan

3rd Floor Plan

Floors 4, 8–10, 14 Plan

Floors 5–7, 11–13 Plan

15th Floor Plan

16th Floor Plan

2nd Floor Plan

3rd Floor Plan

Floors 4, 8–10, 14 Plan

Floors 5–7, 11–13 Plan

15th Floor Plan

16th Floor Plan

Apartment type – 2A (Section: 1.3)

Sections 3.1–3.4 – commissioned.

Number of rooms Area (sq.m.) Price per 1 sq.m (USD)* Total price (USD)*
1-bedroom apartment 41.2 1030 - 1040 42 436 - 42 848
2-bedroom apartment 67 - 68.2 900 - 960 60 300 - 65 472
3-bedroom apartment 92.3 890 82 147
Two-level apartment 88 1025 90 200

Sections 4.1–4.2 – commissioning in Q3 2026

Number of rooms Area (sq.m.) Price per 1 sq.m (USD)* Total price (USD)*
1-bedroom apartment 40.00 - 52.10 950 - 1010 40 000 - 51 900
2-bedroom apartment 65.40 960 62 784
3-bedroom apartment 92.20 - 97.30 850 - 860 79 292 - 82 705
Parking 32.4 1000 32 400

Sections 5.1–5.2 – commissioning in Q3 2027

Number of rooms Area (sq.m.) Price per 1 sq.m (USD)* Total price (USD)*
1-bedroom apartment 40.00 - 52.10 850 - 980 38 130 - 49 824
2-bedroom apartment 64.60 - 75.60 840 - 950 59 432 - 63 812
3-bedroom apartment 92.20 - 97.40 810 - 890 75 604 - 86 686
Two-level apartment 84.7 1000 84 700
Creative studios 51.30 - 97.40 750 - 830 41 040 - 77 920
Storage rooms 5.20 - 5.40 1300 6 760 - 7 020

* price valid for 100% payment. Installment payment is possible.

GENERAL VIEW
GENERAL VIEW
GENERAL VIEW
GENERAL VIEW
GENERAL VIEW
GENERAL VIEW
GENERAL VIEW
GENERAL VIEW
GENERAL VIEW
GENERAL VIEW
GENERAL VIEW