PROJECT PROGRESS (Phase 6)

Foundation works

43%

Construction of the building frame

0%

Masonry of exterior and interior walls

0%

Facade works

0%

Roofing installation

0%

Installation of internal utilities

0%

Interior finishing works

0%

Landscaping

0%
* Responsible – Huriiev Leonid Ivanovych

Residential Complex Real Park NOVA

  • 3 Ovidiopolska Road
  • Commissioning date:
  • Phase VI (sections 4.3, 4.4, 4.5) — Q2 2028

The Real Park NOVA residential complex is located in the Khadzhibe district of Odesa and represents a new stage in the development of the Real Park project. It’s not just a continuation of an already well-known large-scale complex, but a reimagined vision of what modern living space should be today and in the future. The new project preserves the best features of Real Park while introducing a contemporary design, redesigned layouts, and an updated spatial concept.

  • A quiet, green district with well-developed infrastructure.
  • Convenient transport connections.
  • Well-developed internal infrastructure of the complex.
  • Improved engineering solutions and materials that meet modern energy-efficiency standards.
  • Modern façades with an emphasis on lightness, geometry, and brightness.
  • Direct elevator access to the underground parking (including for people with limited mobility).
  • Backup power supply for key building systems: boiler room, heating stations, water supply, elevators, and lighting of common areas.
  • A variety of layouts with an increased level of comfort.
  • 24/7 security and video surveillance.
  • A courtyard built under a unified concept with children’s and sports playgrounds, and recreational walking areas.
  • A spacious entrance group with an original interior design.
  • Own property management company.

View Gallery

PROJECT PROGRESS (Phase 6)

Foundation works

43%

Construction of the building frame

0%

Masonry of exterior and interior walls

0%

Facade works

0%

Roofing installation

0%

Installation of internal utilities

0%

Interior finishing works

0%

Landscaping

0%
* Responsible – Huriiev Leonid Ivanovych

Residential Complex Real Park NOVA

A multi-storey residential complex with underground parking and social and commercial facilities.

Construction start (Real Park): Phase I (sections 2.1–2.5) – Q2 2017
Construction completion: 

Phase І (sections 2.1–2.5) — commissioned.

Phase IV (sections 1.4–1.7) — commissioned.

Phase III (sections 1.1–1.3) — commissioned.

Phase II (sections 2.6–2.9) — commissioned.

Phase VII (sections 3.1–3.3) — Q1 2026.

Phase VI (sections 4.1–4.5 - Real Park NOVA) — Q2 2028.

 

Contractor:  LLC STIKON.

Client:  Plant Breeding & Genetics Institute – National Centre of Seed & Cultivar Investigation of the National Academy of Agrarian Sciences of Ukraine.

Location:  3 Ovidiopolska Road

 
  • ENGINEERING SYSTEMS
  • Project type: monolithic-frame.
  • Foundation: pile foundation.
  • Wall materials: interior walls — aerated concrete, exterior walls — aerated concrete and monolithic reinforced concrete with mineral wool insulation.
  • Floor slabs: monolithic reinforced concrete.
  • Roof: combined roof (soft roofing with metal tiles).
  • Flooring: screed, except in bathrooms.
  • Facade finishing: ceramic facing brick, partially decorative plaster over mineral wool insulation.
  • Interior wall finish:  unfinished, except common areas.
  • Ceiling height (m):  2.7 m.
  • Heating system:  supplied from an autonomous rooftop boiler room; two-pipe dead-end system with horizontal in-apartment distribution; steel panel radiators with shut-off and control valves.
  • Windows:  PVC windows with fittings and energy-efficient glazing.” рекомендуется “Windows: PVC windows, hardware included, with energy-efficient double-glazing units.

  • INTERNAL ENGINEERING SYSTEMS  
  • Power supply:  connections to apartments, with installation of meters and circuit breakers in the floor distribution panels.
  • Water supply:  cold and hot water risers with meters.
  • Sewerage:  soundproof waste pipes.

Plan Real Park NOVA

 

Master Plan



VI Commissioning Phase

Floors 2–16 Plan

Floors 2–16 Plan

Technical Floor Plan

Floors 2–16 Plan

Technical Floor Plan

RC Real Park Sections 4.3, 4.4, 4.5 - commissioning in Q2 2028

Number of rooms Area (sq.m.) Price per 1 sq.m. (USD)* Total price (USD)*
1-room apartment 36.6 - 49.4 770 - 950 33 065 - 44 213
2-room apartment 61,4 - 66.2 770 - 915 47 971 - 59 006
3-room apartment 89.7 - 97.3 770 - 895 71 312 - 84 651
Creative studios (technical floor) 38,6 - 90 750 - 935 32 231 - 76 500

* the price is indicated for 100% payment. Payment in installments up to 4 years is possible.

Have any questions?
Get a personal consultation!