Please note!
Our internal exchange rate is always lower than the market rate.
1 USD = 43.8000 UAH Pay under the contract
This property is
being viewed now:
  • General Information
  • Technical Information
  • Layouts
  • Prices
  • Photo Gallery
  • Video Gallery

View Gallery

PROJECT PROGRESS (Phase 1)

(Sections 2.1–2.5) — commissioned.

PROJECT PROGRESS (Phase 4)

(Sections 1.4–1.7) — commissioned.

PROJECT PROGRESS (Phase 3)

(Sections 1.1–1.3) — commissioned.

PROJECT PROGRESS (Phase 2)

(Sections 2.6–2.9) — commissioned.

 

PROJECT PROGRESS (Phase 7)

Foundation works

100%

Construction of the building frame

100%

Masonry of exterior and interior walls

100%

Facade works

90%

Roofing installation

100%

Installation of internal utilities

85%

Interior finishing works

80%

Landscaping

0%
* Responsible — Huriiev Leonid Ivanovych

Residential Complex Real Park

  • 3 Ovidiopolska Road
  • Commissioning:
  • Phase I (sections 2.1–2.5) — commissioned.
  • Phase IV (sections 1.4–1.7) — commissioned.
  • Phase III (sections 1.1–1.3) — commissioned.
  • Phase II (sections 2.6–2.9) — commissioned.
  • Phase VII (sections 3.1–3.3) — Q1 2026.
  • Phase VI — watch the project RC Real Park NOVA.

The Real Park residential complex is located in the Khadzhibey district of Odesa, one of the greenest areas within the city. This large-scale project is being developed in several phases and will include not only residential buildings but also commercial infrastructure.

  • A quiet area of the city with well-developed infrastructure
  • High thermal efficiency (exterior walls made of ceramic blocks
  • Convenient transport connections
  • 24/7 security and video surveillance
  • Well-arranged courtyards with playgrounds and sports areas
  • Own property management company
 

In April 2026, a new stage of development was unveiled for the residential complex -
the updated Real Park NOVA project.

View the Real Park NOVA project

View Gallery

PROJECT PROGRESS (Phase 1)

(Sections 2.1–2.5) — commissioned.

PROJECT PROGRESS (Phase 4)

(Sections 1.4–1.7) — commissioned.

PROJECT PROGRESS (Phase 3)

(Sections 1.1–1.3) — commissioned.

PROJECT PROGRESS (Phase 2)

(Sections 2.6–2.9) — commissioned.

  

PROJECT PROGRESS (Phase 7)

Foundation works

100%

Construction of the building frame

100%

Masonry of exterior and interior walls

100%

Facade works

90%

Roofing installation

100%

Installation of internal utilities

85%

Interior finishing works

80%

Landscaping

0%
* Responsible — Huriiev Leonid Ivanovych

Residential Complex Real Park

    • A multi-storey residential complex with underground parking and social and commercial facilities.

      Start of construction:  Phase I (sections 2.1–2.5) — Q2 2017
      Completion of construction: 

      Phase I (sections 2.1–2.5) — commissioned.

      Phase IV (sections 1.4–1.7) — commissioned.

      Phase III (sections 1.1–1.3) — commissioned.

      Phase II (sections 2.6–2.9) — commissioned.

      Phase VII (sections 3.1–3.3) — Q1 2026.

      Phase VI — watch the project RC Real Park NOVA.

       

      Contractor: LLC “Stikon”.
      Client: Plant Breeding & Genetics Institute – National Centre of Seed & Cultivar Investigation of the National Academy of Agrarian Sciences of Ukraine.
      Location: 3 Ovidiopolska Road

      ENGINEERING SYSTEMS
      Project type: monolithic-frame.
      Foundation: pile foundation.
      Wall materials (interior & exterior): aerated concrete and ceramic bricks.
      Floor slabs: monolithic reinforced concrete.
      Roof: combined roof (soft roofing with metal tiles).
      Flooring: screed, except in bathrooms.
      External facade finish: ceramic facing bricks.
      Interior wall finish: unfinished, except common areas.
      Ceiling height (m): 2.7 m.
      Heating system: supplied from an autonomous rooftop boiler room; two-pipe dead-end system with horizontal in-apartment distribution; steel panel radiators with shut-off and control valves.
      Windows: PVC windows with fittings and energy-efficient glazing.” рекомендуется “Windows: PVC windows, hardware included, with energy-efficient double-glazing units.

      INTERNAL ENGINEERING SYSTEMS 
      Power supply: connections to apartments, with installation of meters and circuit breakers in the floor distribution panels.
      Water supply: cold and hot water risers with meters.
      Sewerage: soundproof waste pipes.

Master Plan

Parking Pavilion Structure

Parking (Sections 2.6–2.9)

Parking, Sections 2.6–2.9

Parking, Sections 3.1–3.3


I Commissioning Phase

Basement Floor Plan

1st Floor Plan

2nd–16th Floor Plan

Technical Floor Plan

Basement Floor Plan

1st Floor Plan

2nd–16th Floor Plan

Technical Floor Plan

Basement Floor Plan

1st Floor Plan

2nd–16th Floor Plan

Technical Floor Plan

Basement Floor Plan

1st Floor Plan

2nd–16th Floor Plan

Technical Floor Plan

1st Floor Plan

2nd–16th Floor Plan


IV Commissioning Phase

Basement Floor Plan

1st Floor Plan

2nd–16th Floor Plan

Technical Floor Plan

1st Floor Plan

2nd–16th Floor Plan

Basement Floor Plan

1st Floor Plan

2nd–16th Floor Plan

Technical Floor Plan

Basement Floor Plan

1st Floor Plan

2nd–16th Floor Plan

Technical Floor Plan


III Commissioning Phase

Basement Floor Plan

1st Floor Plan

2nd–16th Floor Plan

Technical Floor Plan

Basement Floor Plan

1st Floor Plan

2nd–16th Floor Plan

Technical Floor Plan

1st Floor Plan

2nd–16th Floor Plan

Technical Floor Plan


II Commissioning Phase

Basement Floor Plan

1st Floor Plan

2nd–16th Floor Plan

Technical Floor Plan

Basement Floor Plan

1st Floor Plan

2nd–16th Floor Plan

Technical Floor Plan

Basement Floor Plan

1st Floor Plan

2nd–16th Floor Plan

Technical Floor Plan

Basement Floor Plan

1st Floor Plan

2nd–16th Floor Plan

Technical Floor Plan


VII Commissioning Phase

1st Floor Plan

Plan of Floors 2–6

7th Floor Plan

Floors 8–16 Plan

Technical Floor Plan

1st Floor Plan

Plan of Floors 2–6

7th Floor Plan

Plan of Floors 8–16

Technical Floor Plan

1st Floor Plan

2nd–16th Floor Plan


VI Commissioning Phase

View the RC Real Park NOVA

RC Real Park Sections 2.6, 2.7, 2.8, 2.9 – commissioned.

Number of rooms Area (sq.m.) Price per 1 sq.m. (USD)* Total price (USD)*
1-room apartment 41.9 855 35 825
 

RC Real Park Sections 3.1, 3.2, 3.3 – commissioning in Q1 2026

Number of rooms Area (sq.m.) Price per 1 sq.m. (USD)* Total price (USD)*
2-room apartment 59.0 - 68.2 800 - 845 49 855 - 54 756
Commercial premises 39,8 1050 41 790
 

RC Real Park Sections 4.3, 4.4, 4.5 - view the RC Real Park NOVA

* the price is indicated for 100% payment. Payment in installments up to 4 years is possible.

 
GENERAL VIEW
GENERAL VIEW
GENERAL VIEW
GENERAL VIEW
GENERAL VIEW
GENERAL VIEW
GENERAL VIEW
GENERAL VIEW
GENERAL VIEW
GENERAL VIEW
GENERAL VIEW
GENERAL VIEW
GENERAL VIEW
GENERAL VIEW
Have any questions?
Get a personal consultation!